<samp id="um020"><tfoot id="um020"></tfoot></samp>
<strike id="um020"></strike>
<strike id="um020"></strike>
<strike id="um020"></strike>
<samp id="um020"><tfoot id="um020"></tfoot></samp>
<ul id="um020"></ul>
<samp id="um020"><tfoot id="um020"></tfoot></samp><strike id="um020"><s id="um020"></s></strike><ul id="um020"></ul>
  • 欧美国产日韩在线播放_欧亚日韩在线_欧洲成人午夜精品无码区久久_在线免费亚洲无码视频_国产成人精品区在线观看_亚洲av麻豆天堂_亚洲所有免费观看视频_国产av永久网_亚洲国产一区日韩欧美_亚洲AV日韩AV天堂影片精品一

    Scan code consultation:
    0755-2102 2109
    Technology
    Technology
    Current location: Home Technology Ex tech
    Does the whole machine still need to undergo explosion-proof certification, even though the components have explosion-proof certification?

    SINO Testing Services

    | 2021-08-23|Return

    When many clients consult, I purchase components and equipment with explosion-proof certificates. Does the overall equipment assembled together still need explosion-proof certification? complete machineExplosion proof certificationWhat are the requirements?

    As a professional explosion-proof certification agency, Zhongnuo Testing provides a clear answer: complete machine explosion-proof certification is required

    This is because even if all components are equipment with explosion-proof certificates, the connection between components still needs to consider explosion-proof requirements, such as the connection between the electrical control box and the motor, and the lighting fixtures. The cables used should be fire-resistant and flame-retardant, and should be threaded through explosion-proof flexible pipes or galvanized water pipes to prevent external impacts. In addition, the connection between components of different explosion-proof types should also be considered. For example, if there is an electrical connection between explosion-proof products and intrinsic safety products, corresponding safety barriers should be added.

    What are the requirements for applying for explosion-proof certification for the entire machine? What information is required?

    stayZhongnuo TestingThe process of applying for explosion-proof certification for the entire machine is very simple.

    Information:

    1. Copy of valid explosion-proof certificate for each component

    2. BOM table (which is a list of various components to be listed)

    3. Structural diagram

    4. Instruction manual

    5. Enterprise standard

    6. Schematic diagram, etc

    technological process:

    Due to the large size of the overall equipment and the inconvenience of transportation for customers, Zhongnuo Testing generally conducts on-site testing and evaluation at the customer's site. Only one sample is usually needed, and the sample may be disassembled for testing on site. This on-site evidence collection method greatly shortens the customer's evidence collection time and cost!

    success casesAGV carts, chemical storage cabinets, polishing machines, etc


    Related Recommendations
    Contact us
    0755-2102 2109
    Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
    Follow us
    Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號(hào)
    Service Hotline
    18924609560
    點(diǎn)擊這里給我發(fā)消息 1354407946
    點(diǎn)擊這里給我發(fā)消息 1354407946
    欧美国产日韩在线播放_欧亚日韩在线_欧洲成人午夜精品无码区久久_在线免费亚洲无码视频_国产成人精品区在线观看_亚洲av麻豆天堂_亚洲所有免费观看视频_国产av永久网_亚洲国产一区日韩欧美_亚洲AV日韩AV天堂影片精品一 网站地图
    日韩高清无码专区 | 国产无码第十页 | 久久丝袜国产精品 | 亚洲中文字幕第一页精品 | 久久国产亚洲欧美日韩精品 | 久精品国产欧美亚洲色aⅴ大片 | 久久丝袜国产精品 | 亚洲中文字幕无线无码毛片 | 国产成人一区二区在线 | 欧美亚洲高清在线一区 | 久久99亚洲综合精品首页 | 一区二区日韩国产精品 | 亚洲综合视频一区二区 | 午夜国产精品无码久久 | 亚洲AV成人一区二区三区AV | 亚洲中文字幕无线无码毛片 | 精品久久久无码人妻中文字幕 | 中文字幕在线永久在线视频2024 | 久久精品AⅤ无码中文字字幕 | 成人午夜精品一区二区三区 | 欧美一区啪啪视频 | 国产精品日本一区二区在线播放 | 日韩欧美精品综合久久 | 欧美日韩亚洲国内综合网 | 亚洲AV成人一区二区三区AV | 99久久精品免费看国产 | 国产亚洲精品aaa在线观看 | 国产成人亚洲精品无码青青草原 | 欧美成人精品欧美一级黄 | 久久精品中文字幕不卡一二区 | 亚洲精品乱码中文字幕一二三区 | 亚洲欧美日韩第一页 | 国产精品女同一区二区 | 日韩AV无码一区二区三 | 国产成人久久一区二区 | 久久无码专区国产精品 | 国产精品女同一区二区 | 日本午夜亚洲 | 在线亚洲精品视频 | 波多野结衣AV无码久久一区 | 国产欧美另类久久精品91 |